Introduction
In the construction of emergency medical facilities, time is of the essence. GLOBAL HOUSING successfully delivered the Emergency Business Building of Longhua District Central Hospital in Shenzhen, Guangdong, using advanced Steel Structure MiC (Modular Integrated Construction) technology. It took only 96 days to fully complete this modern hospital, making it the first steel structure MiC mobile hospital project in the Longhua District.
Project Overview
- Location: Shenzhen, Guangdong
- Type: Modular Construction (Steel Structure MiC)
- Background: To improve the medical system and enhance healthcare conditions, the hospital initiated the emergency building project. GLOBAL HOUSING participated as the main contractor.
Key Highlights: Performance by the Numbers
- Extreme Speed: Covering an area of 4,915.28㎡ with a total construction area of 6,960.53㎡, the project achieved full completion in just 96 days.
- Precision Manufacturing: The facility is composed of 96 steel structure modules (featuring 21 different types). This “factory-made” approach significantly reduced on-site wet work while ensuring top-tier medical standards.
- Innovative & Mobile: As the district’s first steel-structure MiC mobile hospital, it offers a flexible, relocatable solution for future healthcare expansion.
Construction & Interior
Our photos document the journey:
- From the first module lifting ceremony to the rapid assembly of steel frames.
- Prefabricated units are seamlessly pieced together, minimizing noise and construction waste.
- The interior features bright, clean, and functional medical corridors, ready for immediate operation.
Conclusion
From prefabrication to final handover, GLOBAL HOUSING leverages MiC technology to provide efficient, green, and reliable solutions for healthcare infrastructure. We are committed to reshaping construction speed with technology.